Skip to Content

When Should You Upgrade Your Odoo Version? Key Decision Criteria

November 26, 2026 by
When Should You Upgrade Your Odoo Version? Key Decision Criteria
Juanita Gomez

Odoo releases a major version every year. Six criteria turn the decision to upgrade into a plan with a date, cost, and responsible party.

September 2026 was the planned date for the end of standard support for Odoo 17. On that day, no screen looked different and no invoice stopped being issued. The change happened where no one looks: in who is responsible for an error or a security flaw in the version that your operation uses every day.

With the arrival of Odoo 20, the decision to upgrade is back on the table for every company operating on Odoo. Making it with clear criteria costs much less than making it under pressure.

The idea in brief

  • In recent years, Odoo has released a major version every year and provides standard support for each one for three years.

  • A new version needs a stabilization period before going into production, and the current version has an expiration date. The decision is made between the two.

  • Six criteria determine how soon it is advisable to move.

  • Deciding with a calendar allows time to review your customizations and test calmly.

The calendar set by Odoo

The official documentation of Odoo establishes standard support for three years from the release of each major version. This support includes help desk, bug fixes, and security updates. After that, there is extended support, at an additional cost, which covers help desk and bug fixes based on their viability.

According to the Odoo support calendar, the release dates and end of standard support for the latest versions are as follows: Odoo 16.0 was released in October 2022 and its standard support ended in September 2025. Odoo 17.0 was released in November 2023 and was scheduled to end its standard support in September 2026. Odoo 18.0, released in October 2024, is scheduled to end in September 2027. Meanwhile, Odoo 19.0 was released in September 2025 and is scheduled to end its standard support in September 2028.

For your operation, these dates translate into a calendar data point: the months you have left to comfortably complete an update.

Six criteria for decision-making

Each criterion is answered with information that your company already has. Together they form the plan.

1. The migration window

A new version needs time to mature, and a current version has an expiration date. The decision is made between those two extremes.

  • Start of the window: when the target version finishes its stabilization. During that period, the first users in production report bugs, fixes are released, and third-party modules, integrations, and localizations adapt to the version.

  • End of the window: the end of standard support for your current version. The official documentation recommends working on a supported version. A version that has surpassed standard support only has extended support, which incurs additional costs and bug fixes subject to feasibility.

Migrating in the first weeks exposes your company to errors that other users have not yet reported. Migrating on the closing date leaves no room for testing. Count backward from the end of support and reserve time for diagnosis, testing, and adjustments.

Stabilization depends on what each company uses. A version is ready for you when most of these signals are met:

  • The third-party and custom modules you use already have a version for the target version. The official upgrade guide supports this point: a database with custom modules cannot be upgraded until there is a version of those modules for the target version.

  • Critical integrations (banks, e-commerce, invoicing, payroll) are available for that version.

  • The tax localization and regulatory requirements you use are covered and up to date.

  • The version has already received several rounds of fixes since its release.

  • There are production implementations of that version that you can consult as a reference.

2. The distance between your version and the current one

Odoo allows upgrading from any version, and the official upgrade guide indicates that a smaller gap facilitates the process. Each year of distance accumulates changes in the screens and in standard behavior, and your customizations must coexist with all of them.

3. How much of your Odoo is customized

This criterion usually weighs more on the cost. The official guide explains it clearly: a database with custom modules cannot be upgraded until there is a version of those modules for the target version, and whoever maintains each module is responsible for correcting what the version change affects.

The Odoo Enterprise service agreement covers the update of standard applications, customizations made with Studio (as long as Studio and its subscription are active), and customizations with a maintenance subscription. Custom or third-party modules without maintenance, the cleaning of pre-existing data, and training on the new version are excluded from this coverage.

Before deciding, it is advisable to inventory three things for each customized module:

  • what problem it solves

  • who maintains it

  • if the target version already covers that need natively, which can be verified in the official documentation

Each customization that the new version already covers is one less module to maintain.

4. The functional value that the new version adds to your operation

A new feature justifies the update when it eliminates a customization, replaces manual work, or enables a need that is currently waiting in line. The method consists of listing your pending needs and contrasting them with the official notes of the target version. Three questions organize that list:

  • What business need is still pending due to a lack of a function?

  • What manual work from your team exists due to a limitation of the current version?

  • What of your customizations could be removed?

5. External integrations and dependencies

The official guide recommends testing end-to-end business flows, including integrations, flows between applications, exports, automated actions, and server actions. There is an important detail: the test base is delivered "neutralized," that is, with scheduled actions, outgoing emails, payment providers, and bank synchronization disabled or reset. Those connections require separate validation.

6. The capacity and schedule of your organization

Three pieces of information from the official guide weigh on the schedule:

  • The production base is not available during the update, so it is scheduled during a low-activity window.

  • Once completed, it is impossible to revert to the previous version.

  • Changes made in production during the process do not carry over, and the updated copies do not include the attachment storage (filestore), which must be merged before going live.

The guide also recommends rehearsing the entire process the day before going live. For this, key users are needed with time to test real flows, and a period free of accounting closures and peak season.

Summary of the six criteria

To evaluate the six criteria together, it is advisable to review what needs to be verified in each one and what situations indicate greater urgency:

1. Migration window: check the end of standard support for your version and the maturity signals of the target version. The update becomes urgent when the support date has already expired or is within the next twelve months.

2. Distance: check how many major versions there are between the one you are using and the current one. A gap of two or more major versions indicates greater urgency.

3. Customization: identify the custom modules, who is responsible for maintaining them, and whether they are still necessary. The lack of an identified maintainer for any of these modules is a sign of urgency.

4. Functional value: identify the needs that are pending and that the new version can cover. If there are critical needs that are now resolved natively, it is advisable to consider the upgrade.

5. Integrations: identify the connected systems and the testing plan for each one. The absence of a testing plan for critical integrations is a sign of urgency.

6. Capacity: review the availability of key users and the low activity windows to perform the upgrade. If there are few windows available before the end of support date, it is time to prioritize planning.

Three scenarios to decide

The thresholds in the table are a practical rule of EmasT and serve as a starting point. With them, your company falls into one of three scenarios:

  • Upgrade now: your version has already lost standard support, will lose it in the coming months, or you have critical needs that the target version covers. Choose as the target the most mature version that meets your needs, which may be the most recent or the previous one.

  • Plan with a calendar: your version has support for more than a year. Use that time to inventory customizations, remove those that the new version covers, follow the maturity signals of the target version, and define the upgrade window.

  • Maintain and monitor: your version has ample support and no critical needs are pending. Review the six criteria once a year, when Odoo releases the new version.

How much it costs to decide late

Deciding with a calendar allows what urgency eliminates: reviewing each customization, removing those that are no longer needed, testing with users who know the workflows, and rehearsing the production rollout. With the date looming, that work gets compressed and the priority shifts from improving operations to preventing a halt.

How much it costs to migrate too early

Migrating in the first weeks of a version also has costs: tests that are repeated when corrections arrive, third-party modules that are still not ready, and an implementation team that barely knows the version. Stabilization reduces that cost, and signs of maturity allow you to recognize when it has finished for your case.

How we approach it at EmasT

Before any update, we conduct a diagnosis, with the same principle of anticipation that we apply before an implementation: we inventory modules and customizations, we contrast them with what the target version offers natively according to the official Odoo documentation, we evaluate if that version is already mature for your case (third-party modules, integrations, and localization), and we assess impact and cost before committing to dates.

The update process resembles a project in itself, with its own planning, testing, and production rollout, and we address it separately in this series.

The best date to update is the one that appears on your calendar before it appears in your urgency. If you are evaluating your version of Odoo today, we would be happy to review these six criteria with you.

References

When Should You Upgrade Your Odoo Version? Key Decision Criteria
Juanita Gomez November 26, 2026
Share this post
Tags
Archive